South Street, Glasgow Harbour - Phase 1

image
This typical reclamation project saw us break out and remove concrete floor slabs and heavily-reinforced foundations to a minimum depth of 1.5 metres below original ground level. Larger structures were removed below that nominal limit.
 
 
The excavated concrete was crushed and re-used on the site, either by spreading immediately or by stockpiling for later use elsewhere on the development. Reinforcing steel was taken off site for recycling.
image
 
 
 

Description:
Reclamation   

Form of Contract:
Client - Specific

Contract Value:
£260,000

Duration:
5 weeks (Nov to Dec 04)

Client:
Clydeport Properties

Client’s Representative:
Capita Symonds