South Street, Glasgow Harbour - Phase 1
This typical reclamation project saw us break out and remove concrete floor slabs and heavily-reinforced foundations to a minimum depth of 1.5 metres below original ground level. Larger structures were removed below that nominal limit.
The excavated concrete was crushed and re-used on the site, either by spreading immediately or by stockpiling for later use elsewhere on the development. Reinforcing steel was taken off site for recycling.
|
Description: Reclamation
|
Form of Contract: Client - Specific
|
Contract Value: £260,000
|
Duration: 5 weeks (Nov to Dec 04)
|
Client: Clydeport Properties
|
Client’s Representative: Capita Symonds
|
|