Hamilton Western Expansion Zone

image This contract comprised site clearance, earthworks and enabling works across the 24hectare site of a proposed housing development for the consortium of Kier Homes, Bryant Homes and Bett Homes.
The earthworks included the excavation of a 230,000m3 stockpile of existing colliery spoil and its subsequent re-use as a structural fill material. All materials sourced from colliery waste were tested for contaminants prior to, and during, filling operations.  The colliery spoil formed the founding layer for the new housing. It was overlaid by a layer of non-structural clays won from an on-site borrow pit then by topsoil from stockpiles that had initially been stripped from the site. 
 
 
 

Several abandoned mineshafts were  associated with the former colliery at  this location and two were capped as  part of  the contract. The total  earthworks quantity including colliery  spoil, topsoil, unsuitable material and  capping was approximately 400,000m3.
Further works included the formation of drainage swales and associated drainage systems, along with footpaths, lighting and grass seeding.
image  

Description:
Bulk Earthworks and Site Enabling Works

Form of Contract:
ICE 5th Edition

Contract Value:
£782,000

Contract Period:
4 Months (July - Nov 02)

Client:
Hamilton West Consortium

Consultant:
Dougall Baillie Associates